Skip to main content

9 Millbank – Westminster, London SW1P 3GE

PROJECT
The project consists of the renovation of the Imperial Chemical House (1929), classified as a building of special interest, fit to become a prestigious residential complex on the banks of the Thames near the Palace of Westminster.

CHALLEGES
In accordance with local regulations, the change of use led to an increase in the required fire resistance, requiring the need for passive fire protection of load-bearing structures.

SOLUTIONS
Our team of experts in structural fire engineering came up with innovative solutions to ensure the highest level of fire safety. We designed a bespoke passive fire protection system to not only maintain tenable conditions but also add value to the overall project. Our system is tailored to the structure’s unique characteristics and is a testament to our commitment to providing customised solutions for our clients.